Part 135 SMS requirements: what Part 5 asks for by 28 May 2027

If you hold a Part 135 certificate, you need a safety management system that meets 14 CFR Part 5, and you need to tell the FAA you have one. What the rule says, who it applies to, and what your SMS has to contain.

The deadline

Section 5.9(a) says anyone authorised to conduct Part 135 operations, or holding a § 91.147 Letter of Authorization, before 28 May 2024 must:

(1) Develop and implement an SMS that meets the requirements of this part no later than May 28, 2027. (2) Submit to the FAA, a declaration of compliance with this part in a form and manner acceptable to the Administrator no later than May 28, 2027.
14 CFR § 5.9(a)

If you applied on or after 28 May 2024, you need the SMS before you're authorised (§ 5.9(b)). Once you have it, you keep it for as long as you hold the authorisation (§ 5.9(c)), and you show it to the FAA on request (§ 5.9(d)).

Single-pilot operators: where one pilot performs every function, § 5.9(e) switches off a list of requirements, including parts of the safety policy, the coordination of emergency response planning and the communication records. Read the list against your own operation.

What your SMS has to contain

Part 5 has four building blocks, plus documentation and records.

1. Safety policy (§ 5.21). At least: your safety objectives and your commitment to them; a statement on resources; a safety reporting policy; a policy on unacceptable behaviour and discipline; an emergency response plan (§ 5.27); and a code of ethics that makes safety the highest priority. The accountable executive signs it, it's communicated across the organisation, and it's reviewed regularly.

2. Accountability (§§ 5.23 and 5.25). Name an accountable executive who is the final authority over operations, controls the money and the people, and:

Retains ultimate responsibility for the safety performance of the operations conducted under the person's certificate(s) or Letter(s) of Authorization.
14 CFR § 5.25(a)(4)

They designate managers to run the SMS day to day, facilitate hazard identification and risk analysis, monitor risk controls and report back.

3. Safety risk management (Subpart C). Section 5.51 says you apply it to new systems, revisions of existing systems, new operational procedures, and hazards or weak controls found through safety assurance. In practice that means a documented management of change process. Sections 5.53 to 5.57 cover hazard identification, risk assessment and control, and telling interfacing organisations about hazards.

4. Safety assurance (Subpart D). Section 5.71 lists the minimum data sources: monitoring operational processes and the environment, audits, SMS evaluations, incident and accident investigations, investigations of possible non-compliance, a confidential employee reporting system, and hazard notifications from outside. You also need a process that analyses that data (§ 5.71(b)), assesses safety performance (§ 5.73) and drives continuous improvement (§ 5.75).

Safety promotion (Subpart E): training and competencies (§ 5.91) and safety communication (§ 5.93).

Documentation and records (Subpart F). Section 5.97 sets how long records are kept: risk management outputs for as long as the control stays relevant; safety assurance outputs for at least 5 years; training records for as long as the person is employed; communications for at least 24 months.

A quick check of where you stand

  • Is your safety policy signed by the accountable executive, with all seven elements of § 5.21(a)?
  • Is there a written process for assessing risk before a change: a new aircraft, base, procedure or contractor?
  • Do you have the § 5.71(a) data sources, and does anyone actually analyse the data?
  • Can you show training records and five years of safety assurance outputs?
  • Have you planned how and when you'll submit the declaration of compliance?

Doing the check yourself

A gap analysis of your SMS manual against Part 5 is often the first thing operators pay outside help for. It doesn't have to be. Chuck reads your SMS manual against Part 5 section by section and sets out, against each requirement, what your manual says and where it may fall short, citing the rule on every line. Your own safety manager checks it and decides what changes.

Sources

This briefing summarises 14 CFR Part 5 as published on eCFR (text as of 29 October 2026). It isn't legal advice: check the rule text and FAA guidance for your own operation.

Bring the work in-house.